Housing Management Estates Action HMEA
Housing Management Estates Action (HMEA) was a program, run by the Department of the Environment, aimed to improve the appearance and energy efficiency of high-rise buildings, and to tackle damp issues.Knowsley Heights was one of the buildings where an ACM cladding system was tested as part of the HMEA project.
A fire of the rubbish in an external storage was started deliberately, at the building's base, it spread rapidly through GRP cladding, and lack of fire barriers within the cavity between the cladding and the building's walls. The fire rapidly engulfed the north side but no fatalities occurred.
According to the BBC, the fire at Knowsley Heights involved cladding panels made by Arconic, the same company that manufactured the cladding used on Grenfell Tower. The refurbishment was funding by a government pilot scheme for cladding Housing Management Estates Action and the Building Research Establishment (BRE) had previously assessed the cladding and concluded that it did not pose a significant risk unless there were large cavities that could aid fire spread.
Featured articles and news
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.




















